Recently Featured | Most Discussed | Most Recent | Most Responded | Most Viewed | Top Favorites | Top Rated | TV Serials | Trailers | Recently Watched
TI 8 beam commissioning - CERN
This ad will close in 15 seconds
Rate:

6 ratings
Views:
838
From : hellgas0
Added: Jun 19, 2008
The Objectives of the TI 8 beam commissioning: * Verify equipment functionality: Bumpers, Extraction Kickers, Extraction Septa, Magnetic elements, Power converters, Interlocks, control system, surveillance systems, vacuum... * Commission beam instrumentation: BPMs, BLMs, BCT, Screens, BST * Beam measurement & correction * Trajectory acquisition and correction, check correction scheme * Reproducibility of trajectory * Matching from SPS * Optics in line, tilts, matching to LHC * Aperture * Check corrector and BPM polarities * 12 hour run to validate thermal behaviour of tunnel * Multi-bunch extraction * Check RP assumptions * Preparation for LHC injection test... Video Source: http://cdsweb.cern.ch/record/1108527 This video was posted with the expressed written consent for the use of this video, from Cern
Category : Tech
Added: Jun 19, 2008
The Objectives of the TI 8 beam commissioning: * Verify equipment functionality: Bumpers, Extraction Kickers, Extraction Septa, Magnetic elements, Power converters, Interlocks, control system, surveillance systems, vacuum... * Commission beam instrumentation: BPMs, BLMs, BCT, Screens, BST * Beam measurement & correction * Trajectory acquisition and correction, check correction scheme * Reproducibility of trajectory * Matching from SPS * Optics in line, tilts, matching to LHC * Aperture * Check corrector and BPM polarities * 12 hour run to validate thermal behaviour of tunnel * Multi-bunch extraction * Check RP assumptions * Preparation for LHC injection test... Video Source: http://cdsweb.cern.ch/record/1108527 This video was posted with the expressed written consent for the use of this video, from Cern
Category : Tech
Related Videos

Video Categories:
Also Try:










